Modular camps for mining, oil and gas, and job sites: a buyer’s guide

How flat-pack modules compare with converted containers and site-built camps, what pre-integrated MEP includes, and how to calculate the cost per cycle of use.

Dry assembly of a flat-pack module on pier footings

Scope of this guide. Published costs, savings and schedules are indicative examples, not a project quotation or guarantee. Compare the same location, specification and scope. Structural supply, civil works, building services, finishes and logistics must be confirmed separately; permit and engineering requirements depend on the site.

In short

  • SmartBrix Construction deploys modular camps for oil and gas, mining, military, and construction operations in weeks, and delivers a complete modular project in 60–120 days.
  • Interconnectable modules ship flat-packed and optimized for standard containers, with direct export from Panama to Central America and the Caribbean.
  • MEP systems arrive pre-integrated from the plant; on site, pier footings are poured, modules are set, and only utility connections are made.
  • When the operation closes, the camp is dismantled and reused at the next site, which lowers total cost compared with building anew on every site.
  • SmartBrix does not publish prices for its modular line; it quotes each camp by scope, based on headcount, uses, and location.

SmartBrix Construction deploys modular camps for oil and gas, mining, military, and construction operations in weeks. Its interconnectable modules ship flat-packed, arrive with MEP (mechanical, electrical, and plumbing) systems pre-integrated at the plant, and are dry-assembled on site. A complete modular project is delivered in 60–120 days. When the operation closes, the camp is dismantled and moved to the next site.

This buyer’s guide is for operations, logistics, and procurement managers at oil and gas operators, mining companies, contractors, and defense agencies. It explains how a flat-pack module differs from a converted shipping container and how to plan logistics to a remote site. It also covers what pre-integrated MEP includes, how to compare cost per cycle of use, and what to send for a quote.

Four uses: oil and gas, mining, military, and job sites

SmartBrix configures its interconnectable modules to each operation. The four most requested uses share one requirement: complete facilities from mobilization, in places with no existing infrastructure.

  • Oil and gas camps. Workforce housing, dining halls, offices, and laboratories for drilling campaigns and field operations, where every day without facilities means crews without housing and equipment sitting idle.
  • Mining camps. Housing, dining halls, common areas, and laboratories for remote operations, with flat-pack container logistics to hard-to-reach sites.
  • Military bases and camps. Rapid deployment and dry assembly, with modules that can be expanded or relocated as the operation changes.
  • Site and corporate offices. Job-site offices, sales offices, and temporary headquarters set up in weeks, expandable and reusable on the next project.

The same modules can also be configured as clinics, classrooms, and mobile laboratories, so the operation’s support facilities fit under one contract. See the applications on the offices and camps page.

A camp also does not have to be deployed in full on day one. Because the modules are interconnectable, dormitories, dining halls, offices, and laboratories combine and expand module by module as the operation grows. In practice, a project can start with a minimum core of housing, a dining hall, and an office, then add modules as the crew grows or the project moves to its next phase. That is worth defining in the quote: state both the initial capacity and the maximum capacity you expect to need.

Flat-pack module, converted container, or site-built camp

Camp buyers usually compare three options, summarized in the table below. Only the SmartBrix column uses published data; the other two describe general traits that vary by supplier and site.

CriterionSmartBrix flat-pack moduleConverted shipping containerSite-built camp
DeploymentWeeks; complete modular project in 60–120 daysDepends on how much each container is modified (cutouts, insulation, building systems)Depends on material hauling, local labor, and weather
TransportFlat-packed and optimized for standard containers, with direct export from PanamaEach unit ships assembled, at its full volumeLoose materials hauled to the site
RelocationDisconnected, dismantled, and moved to the next siteMoved as a complete unit, lifting and hauling its full volumeUsually not relocated; demolished or left in place at closeout
MEPPre-integrated at the factory; only utility connections on site (RETIE in Colombia)Fitted unit by unit, depending on the conversionInstalled on site
PermanenceTemporary or permanent, with several cycles of useDepends on the conversion and maintenanceUsually permanent
WasteUp to 30% less construction waste; dry assemblyDepends on the extent of modificationDepends on the building system; wet construction leaves more debris on site
Design basisNSR-10, REP-2021, or IBC, depending on the jurisdictionDepends on the supplier and jurisdictionDepends on the project and jurisdiction

The underlying difference is design intent. A flat-pack module is designed from the start to ship flat-packed and be dry-assembled, while a converted container starts as a cargo box that is modified afterward. For operations that move several times, shipping volume and ease of dismantling matter as much as the purchase price.

Logistics to remote sites and export from Panama

The modules are factory-built with panels, finishes, and integrated building systems, and ship flat-packed and optimized for standard containers, which means more modules per shipment and workable logistics to remote sites.

From Panama, SmartBrix exports directly to Central America (Costa Rica, El Salvador, Honduras, and Guatemala) and the Caribbean (Dominican Republic, Curaçao, Aruba, Trinidad, and Jamaica), and serves Colombia from its Bogotá office. Coverage is confirmed for each location, and import treatment is decided by the destination customs.

Before shipping, settle four site logistics points:

  1. Access: route, bridges, and load restrictions up to the assembly point.
  2. Lifting: equipment available to unload the modules and set them on the footings.
  3. Foundations: leveled pier footings, defined from the geotechnical report or site conditions.
  4. Utilities: whether the systems connect to an existing utility supply or to the camp’s own power, water, and wastewater systems.

These four points belong in the plan before the first container leaves the plant. Modules that reach a site without a leveled grid of pier footings, lifting equipment, or a defined utility connection wait on site. That wait uses up the time the flat-pack format was meant to save.

For operations in Guyana and other markets where PEB Corp coordinates engineering and export, see PEB Corp’s guide to steel warehouses for oil and gas in Guyana.

Pre-integrated MEP and dry assembly

In a SmartBrix modular camp, the MEP comes pre-integrated: mechanical, electrical, and plumbing systems are installed and tested at the factory before dispatch, together with panels and finishes. On site, the systems are connected to the utility supply or to the camp’s own systems, and in Colombia electrical systems comply with RETIE.

On-site assembly follows the eight-step process SmartBrix publishes for its modular line, which includes the finishes and connections completed in the field:

  1. Pier footings: leveled footings under each module.
  2. Structural assembly: erection of each module’s steel structure.
  3. Module setting: lifting and placing modules on the footings.
  4. Exterior finishes: enclosure and building envelope.
  5. Interior finishes: interior walls, floors, and ceilings.
  6. Panels and partitions: installed per the project layout.
  7. Electrical systems: connection and testing of electrical circuits.
  8. Plumbing systems: connection of plumbing lines and fixtures.

Apart from the pier footings, assembly is dry: it does not wait for concrete to cure, and it generates up to 30% less construction waste. The modular process is also up to 90% faster than traditional construction. Each camp is designed to the code of its jurisdiction: NSR-10 in Colombia, REP-2021 in Panama, and IBC where applicable. The full system is explained on the modular construction page.

Relocation and reuse: the camp’s cost per cycle

A camp’s life does not end with the operation. Because assembly is dry, the modules are disconnected, dismantled, and shipped flat-packed in standard containers to the next project when the operation closes. The same asset serves several operations and lowers total cost compared with building anew on every site.

The useful comparison is therefore cost per cycle of use, not purchase price. To run it with your own numbers, separate two groups of costs:

  • Initial investment: supply of the modules with pre-integrated MEP.
  • Costs in every cycle: transport to the site, pier footings, assembly and interconnection, operation and periodic maintenance, and disconnection and dismantling at closeout.

Then add the initial investment to the costs of every planned cycle, and divide that total by the number of operations you expect the same camp to serve. The modules are designed for several cycles of use with periodic maintenance. A converted container or a site-built camp may carry a different upfront price, but the math changes once you add the moves, the demolition, and the days without facilities at each new site.

What to send for a quote

SmartBrix does not publish prices for its modular line; each camp is quoted by scope. With these inputs, the team prepares a comparable technical proposal:

  • Headcount the camp must house or serve, and the shift pattern.
  • Initial and maximum capacity: the modules needed to start operating and the growth expected by phase.
  • Required uses: dormitories, dining halls, offices, laboratories, restrooms, or clinics.
  • Location and access: country, municipality or coordinates, and road conditions to the site.
  • Expected duration of the operation and the number of planned moves.
  • Available utilities: existing connections, or the need for the camp’s own power, water, and wastewater systems.
  • Required operating date and site constraints (security, working hours, and site permits).

If your company already has a contractor and only needs steel for a permanent structure, NewCon Steel® supplies cold-formed profiles and pre-assembled structural panels; erection is then the responsibility of the contractor the buyer appoints. If the operation also needs permanent buildings, such as warehouses or workshops, SmartBrix’s primary line is steel framing.

Oil, mining, and military camps are part of the experience behind the modular line, alongside more than 350 PEB Corp Group projects executed by SmartBrix Construction over 15+ years; documented cases are in the project portfolio. For operations in Colombia, see SmartBrix in Colombia; for Central America and the Caribbean, see SmartBrix in Panama.

Get a camp quote: technical proposal in 48 h → Reply within 24 business hours · technical proposal / quote in 48 h.

Frequently asked questions

How long until a modular camp is operating?
Weeks. Modules arrive from the plant with panels, finishes, and building systems; on site, pier footings are poured, structures are set, and modules are interconnected. A complete modular project is delivered in 60–120 days, depending on scope, with a process up to 90% faster than traditional construction. Site access and transport logistics also affect the schedule.
Can the camp be moved to another site?
Yes. Assembly is dry and involves no demolition: when the operation closes, the modules are disconnected, dismantled, and shipped flat-packed in standard containers to the next project. That reuse turns the camp into a recoverable asset and lowers total cost compared with building anew on every site. The modules are designed for several cycles of use with periodic maintenance.
Does a modular camp include restrooms, kitchens, and building systems?
Building systems, yes: MEP comes pre-integrated, with electrical and plumbing systems installed at the factory together with panels and finishes, and only the utility connections are made on site. Restrooms are provided as the program requires, and modules are configured as dormitories, dining halls, offices, laboratories, or clinics. Kitchen equipment and the camp’s own power, water, and wastewater systems are defined in the quote for each site.
Does a modular camp comply with NSR-10 and REP-2021?
Yes, depending on the country where it is installed: each camp is designed to the code of its jurisdiction, which is NSR-10 in Colombia, REP-2021 in Panama, and IBC where applicable. In Colombia, electrical systems also comply with RETIE. Codes are met through design and project verification; they are not a certificate for the building. For export projects, design follows the destination country’s code, and coverage is confirmed for each location.
Why is there no published price for modular camps?
Because a camp’s cost depends on headcount, uses, location, access, available utilities, and the number of planned moves. SmartBrix does not publish prices for its modular line: it quotes each camp by scope, with a technical proposal prepared from those inputs. We reply within 24 business hours and send the technical proposal / quote in 48 h.