Real steel framing and modular construction projects across Colombia and Panamá — every case published with its area, timeline, and location. Seven documented builds: from a 39,000 m² institutional headquarters to a hospital operational in 30 days.
SmartBrix Construction publishes its projects with verifiable data — the Grupo PEB Corp rule: every claim backed by a real case.
350+
Projects delivered
15+
Years of experience
2
Countries with own offices
7
Documented cases here
02 · Documented cases
Seven projects — with area, timeline, and location.
From the largest institutional headquarters to the fastest hospital: what was built, how fast, where — and the system that made it possible.
Flagship project · Bogotá, Colombia
Institutional
Ministerio de Defensa Nacional
Built area
39,000 m²
Delivery time
8 months
Location
Bogotá, Colombia
Building system
Steel framing
A 39,000 m² institutional headquarters delivered in 8 months in Bogotá — SmartBrix's flagship project. A building at this scale demands that design, fabrication, and erection advance without friction: the turnkey model solved it under one contract and one responsible party. Proof that steel framing performs at institutional scale.
Education
Universidad del Rosario — Sede Mutis y Sede Norte
Built area
5,500 m²
Delivery time
3 months
Location
Bogotá, Colombia
Building system
Steel framing
Two university campuses — Sede Mutis and Sede Norte — totaling 5,500 m² built in 3 months in Bogotá. The academic calendar allows no delays: the structure was fabricated off-site to ±0.5 mm CNC precision and dry-assembled, compressing the schedule without sacrificing quality. Today it is the benchmark for the system's typical range: 3–5 months from foundations.
Higher education · Bogotá, Colombia
Record speed · Ciudad de Panamá
Healthcare
Hospital Modular
Built area
2,430 m²
Delivery time
30 days
Location
Ciudad de Panamá
Building system
Modular construction
2,430 m² of hospital infrastructure operational in 30 days in Panama City — the modular system's record speed and the fastest delivery in the portfolio. Modules left the plant with MEP pre-integrated and were dry-assembled, keeping on-site work to a minimum. The healthcare sector cannot wait; modular construction does not make it wait.
Education
Colegio Santa Luisa
Built area
2,500 m²
Delivery time
3 months
Location
Bogotá, Colombia
Building system
Steel framing
2,500 m² of school infrastructure delivered in 3 months in Bogotá. The structure was plant-fabricated and dry-assembled: less wet work and up to 30% less construction waste than traditional building. Together with Universidad del Rosario, it consolidates the system's track record in the education sector.
Education · Bogotá, Colombia
Events · Bogotá, Colombia
Events
Centro de Eventos Autopista Norte
Built area
6,000 m²
Delivery time
3 months
Location
Bogotá, Colombia
Building system
Steel framing
6,000 m² of event space on Bogotá's Autopista Norte, built in 3 months — the second-largest project in the documented portfolio. Event venues demand open floor plans: steel framing delivers long clear spans with no intermediate columns, with the structure plant-fabricated and dry-assembled on site.
Education
Corporación Universitaria de la Costa
Built area
2,900 m²
Delivery time
3 months
Location
Barranquilla, Colombia
Building system
Steel framing
2,900 m² of university space delivered in 3 months in Barranquilla, in full Caribbean climate. ZAM 180 g/m² coated steel resists tropical corrosion, and the system's structural design is hurricane-verified up to 250 km/h (Cat. 4). Evidence that the 3-month timeline holds across the entire SmartBrix Colombia operation.
Higher education · Barranquilla, Colombia
Phased construction · Ciudad de Panamá
Education
Colegio Bilingüe
Built area
1,100 m² (8 phases)
Delivery time
3 months
Location
Ciudad de Panamá
Building system
Steel framing
1,100 m² executed in 8 phases in Panama City — without interrupting classes. The work was planned in stages: each phase was fabricated at the group plant and dry-assembled, and the school kept operating through the 3 months of construction. Proof that SmartBrix Panamá's industrialized construction coexists with institutions in full operation.
03 · Next project
Your project is next.
This portfolio is not a gallery: it is the method. The same teams that delivered these seven projects design in BIM today, fabricate at the group's CNC plant (EMMA · Zona Franca de Panamá), and install turnkey across Colombia, Panamá, Central America, and the Caribbean. Whether your project is a school, a hospital, an industrial warehouse, or a corporate headquarters, a comparable case already exists on this page — with its area, timeline, and location.
Very likely. The 350+ delivered projects span education, healthcare, industrial and logistics, offices, housing, defense and institutional, events, and camps — steel framing for permanent buildings and prefabricated modules when speed rules. The seven cases on this page range from 1,100 m² to 39,000 m². Tell us your project's use, area, and location and we'll reply with the right system and comparable cases.
Can I visit a delivered project? +
Yes. We coordinate visits to delivered projects in Bogotá and Panama City based on the sector you're interested in. Request a visit through the contact page or email us at info@smartbrix.com: our sales team will propose a date and project that fit your case.
What timelines do you work with? +
Modular projects: finished project delivered in 60–120 days — the Hospital Modular in Panama City (2,430 m²) was delivered in 30 days. Steel framing projects: typically 3–5 months from foundations — Universidad del Rosario (5,500 m²) and Colegio Santa Luisa (2,500 m²) were built in 3 months.
Turn the evidence into your technical proposal.
Send us your project's area, use, and location — our team replies within 48 hours with clear next steps.