Skip to content

PEB Corp Group · SmartBrix Construction · Turnkey construction

Construction case · Institutional · Bogotá, Colombia

Ministry of Defense

SmartBrix Construction delivered this 39,000 m² institutional headquarters in Bogotá in 8 months, with structural engineering by PEB Corp. It is a PEB Corp Group project built in steel framing.

Ministry of Defense · Bogotá, Colombia
Ministry of Defense · Bogotá, Colombia.

Project facts

39,000 m²
in 8 months

Published area
39,000 m²
Reference schedule
8 months
Location
Bogotá, Colombia
System
Steel framing
Construction
SmartBrix Construction
Engineering
PEB Corp

The area and schedule describe this reference; they are not a guarantee for another building.

Scope and responsibilities

SmartBrix construction. PEB Corp engineering.

The engineering case identifies turnkey execution by SmartBrix Construction, with structural engineering and BIM coordination by PEB Corp. The structure was designed to NSR-10. The reference brings together the building, its structural system and the responsibilities of both companies.

Read PEB Corp’s engineering case →

How to use this reference

An institutional headquarters requires a defined space program and coordination between the structure, building services and handover. This case offers a reference for scale: 39,000 m². To compare it with a new headquarters, the area should be considered alongside use, loads, finishes and the intended contractual scope.

Source of the facts and photograph: PEB Corp Group portfolio executed by SmartBrix Construction.

Your next project

Compare scope as well as area.

To evaluate a comparable project in Colombia, share:

  • Building use, approximate area and site location.
  • Office, public-service and support-space requirements.
  • Drawings, geotechnical study and permit status, if available.
  • Expected scope, finish level and target date.

Explore construction scope and applications →

Reply within 24 business hours · technical proposal / quote in 48 h.

About this case

Frequently asked questions

Who built the project and who provided the engineering?
SmartBrix Construction executed the works with PEB Corp engineering. The project forms part of the PEB Corp Group portfolio.
Does this case's schedule apply to a new project?
No. The 8 months schedule applies to this reference. Location, area, use, designs, permits, access and contractual scope are reviewed before confirming a new building's program.
Message us on WhatsApp
Get a quote WhatsApp