Construction case · Institutional · Bogotá, Colombia
Ministry of Defense
SmartBrix Construction delivered this 39,000 m² institutional headquarters in Bogotá in 8 months, with structural engineering by PEB Corp. It is a PEB Corp Group project built in steel framing.

Project facts
39,000 m²
in 8 months
- Published area
- 39,000 m²
- Reference schedule
- 8 months
- Location
- Bogotá, Colombia
- System
- Steel framing
- Construction
- SmartBrix Construction
- Engineering
- PEB Corp
The area and schedule describe this reference; they are not a guarantee for another building.
Scope and responsibilities
SmartBrix construction. PEB Corp engineering.
The engineering case identifies turnkey execution by SmartBrix Construction, with structural engineering and BIM coordination by PEB Corp. The structure was designed to NSR-10. The reference brings together the building, its structural system and the responsibilities of both companies.
Read PEB Corp’s engineering case →
How to use this reference
An institutional headquarters requires a defined space program and coordination between the structure, building services and handover. This case offers a reference for scale: 39,000 m². To compare it with a new headquarters, the area should be considered alongside use, loads, finishes and the intended contractual scope.
Source of the facts and photograph: PEB Corp Group portfolio executed by SmartBrix Construction.
Your next project
Compare scope as well as area.
To evaluate a comparable project in Colombia, share:
- Building use, approximate area and site location.
- Office, public-service and support-space requirements.
- Drawings, geotechnical study and permit status, if available.
- Expected scope, finish level and target date.
Explore construction scope and applications →
Reply within 24 business hours · technical proposal / quote in 48 h.
About this case
Frequently asked questions
Who built the project and who provided the engineering?
Does this case's schedule apply to a new project?
More Colombian references
Explore more group projects.

Higher education · Bogotá, Colombia
Universidad del Rosario — Sede Mutis and Sede Norte
11,500 m² in 100 days · Bogotá, Colombia · Steel framing.
Read the case
Higher education · Barranquilla, Colombia
Corporación Universitaria de la Costa
2,900 m² in 3 months · Barranquilla, Colombia · Steel framing.
Read the caseAuthor: SmartBrix Construction Technical Team · Updated:
