Construction case · Higher education · Barranquilla, Colombia
Corporación Universitaria de la Costa
SmartBrix Construction delivered 2,900 m² of university infrastructure in Barranquilla in 3 months. The steel framing works used PEB Corp engineering and form part of the PEB Corp Group portfolio.

Project facts
2,900 m²
in 3 months
- Published area
- 2,900 m²
- Reference schedule
- 3 months
- Location
- Barranquilla, Colombia
- System
- Steel framing
- Construction
- SmartBrix Construction
- Engineering
- PEB Corp
The area and schedule describe this reference; they are not a guarantee for another building.
Scope and responsibilities
SmartBrix construction. PEB Corp engineering.
The portfolio documents the university use, Barranquilla location, steel framing system, area and schedule. SmartBrix Construction is identified as responsible for execution and PEB Corp for engineering. The published photograph provides a view of the building in this reference.
How to use this reference
This case adds a higher-education reference in Barranquilla alongside the published Bogotá projects. Evaluating an education building at another location involves reviewing the academic brief, site, exposure conditions, building services and erection logistics. The 3-month schedule belongs to this project.
Source of the facts and photograph: PEB Corp Group portfolio executed by SmartBrix Construction.
Your next project
Compare scope as well as area.
To evaluate a comparable project in Colombia, share:
- City, site location and required building area.
- Classroom, administration and service-space requirements.
- Available drawings and studies; site access conditions.
- Target date and expected construction and building-services scope.
Explore construction scope and applications →
Reply within 24 business hours · technical proposal / quote in 48 h.
About this case
Frequently asked questions
Who built the project and who provided the engineering?
Does this case's schedule apply to a new project?
More Colombian references
Explore more group projects.

Institutional · Bogotá, Colombia
Ministry of Defense
39,000 m² in 8 months · Bogotá, Colombia · Steel framing.
Read the case
Higher education · Bogotá, Colombia
Universidad del Rosario — Sede Mutis and Sede Norte
11,500 m² in 100 days · Bogotá, Colombia · Steel framing.
Read the caseAuthor: SmartBrix Construction Technical Team · Updated:
