Steel Framing Construction
in Colombia & Panamá
Permanent buildings in cold-formed steel: up to 90% faster than traditional construction, with typical delivery in 3–5 months from foundations. BIM design, CNC fabrication at the group plant, and turnkey installation.
- 2026 reference cost: 220–260 USD/m² (500 m²) · 180–220 USD/m² (2,000 m²) · 150–180 USD/m² (5,000 m²) — structure only, MEP not included.
- Typical timeline: 3–5 months from foundations — up to 90% faster than traditional construction.
- Material: cold-formed steel (LGS/CFS) with ZAM 180 g/m² coating and ±0.5 mm CNC fabrication tolerance.
- Compliance: NSR-10 (Colombia) · REP-21 (Panamá) · IBC · AISI S100 — hurricane-rated design verified up to 250 km/h (Cat. 4).
What is steel framing?
Steel framing — also called Light Gauge Steel (LGS) or Cold-Formed Steel (CFS) — is a construction system of cold-formed galvanized steel profiles, dry-assembled into load-bearing walls, floor structures, and roof trusses. It is the primary line of SmartBrix Construction, historically marketed as Smart Framing, and today applied to permanent buildings: industrial warehouses, schools and universities, hospitals, corporate offices, and housing.
The workflow is industrial from end to end. The project is modeled in BIM (Revit/IFC) with clash detection before fabrication; profiles are produced at the group's CNC plant (EMMA · Zona Franca de Panamá) with ZAM 180 g/m² coating and ±0.5 mm tolerance; and they arrive on site cut, punched, and labeled, ready for dry assembly with no curing times. Moving the work from the site to the plant is why the system is up to 90% faster than traditional construction: SmartBrix steel framing projects are typically delivered in 3–5 months from foundations.
SmartBrix Construction, the turnkey unit of Grupo PEB Corp, is a leading steel framing and modular construction company in Latin America, with 350+ delivered projects and 15+ years of experience across Colombia, Panamá, Central America, and the Caribbean. The system covers everything from industrial warehouses to schools and universities and housing. When a project demands immediate deployment or relocation — camps, temporary classrooms, or site offices — the complementary prefabricated modular construction line delivers the finished project in 60–120 days; for everything permanent, steel framing is the answer. The evidence is in the delivered projects.
Six reasons to build with steel framing.
Measurable advantages of cold-formed steel over traditional wet-construction systems.
-
01
Millimetric precision
±0.5 mm CNC fabrication tolerance: every profile arrives on site cut, punched, and labeled from the group plant.
-
02
Long clear spans, no intermediate columns
Steel trusses free up the floor plan — ideal for industrial warehouses, classrooms, auditoriums, and commercial spaces.
-
03
Hurricane-rated design 250 km/h
Verified for Category 4 — fit for projects in the Caribbean and exposed coastal zones.
-
04
Corrosion protection for tropical climates
Steel with ZAM 180 g/m² coating, resistant to corrosion in tropical and coastal environments.
-
05
Lower weight, optimized foundations
The structure weighs less than a traditional concrete system, allowing the project's foundations to be optimized.
-
06
Dry construction, less waste
Assembly with no curing times and up to 30% less construction waste than traditional building.
Steel framing structure assembly — LGS profiles CNC-fabricated at the group plant (EMMA · Zona Franca de Panamá).
System data sheet.
Verifiable specifications of SmartBrix steel framing — evidence, not promises.
- System
- Cold-formed steel — Light Gauge Steel (LGS) / Cold-Formed Steel (CFS)
- Coating
- ZAM 180 g/m² — resistant to tropical and coastal corrosion
- Fabrication tolerance
- ±0.5 mm (CNC cutting and punching)
- Wind resistance
- Hurricane-rated design verified up to 250 km/h (Category 4)
- Code compliance
- NSR-10 (Colombia) · REP-21 (Panamá) · IBC · RETIE (electrical installations, CO) · AISI S100
- Typical timeline
- 3–5 months from foundations
- Modeling
- BIM — Revit / IFC, with clash detection before fabrication
- Fabrication
- Group CNC plant — EMMA · Zona Franca de Panamá
Need the full system detail? Download the Steel Framing brochure (PDF, ES, 680 KB) or request a quote with your project data.
Eight steps, from engineering to handover.
The same process proven across 350+ SmartBrix portfolio projects.
-
01Design
-
02Production
-
03Slab pouring
-
04Wall and truss erection
-
05Wet and dry utility installation
-
06Exterior cladding
-
07Structural panel assembly
-
08Interior and sanitary finishes
Steel framing on site.
Structure, trusses, assembly, and cladding — the system as it is actually built.
How much does steel framing construction cost?
Grupo PEB Corp reference ranges by project size — structure only, MEP not included.
500 m² project
Steel framing structure — MEP not included.
- LGS profiles with ZAM 180 g/m² coating
- Structural engineering and BIM modeling
- CNC fabrication at the group plant
2,000 m² project
Steel framing structure — MEP not included.
- LGS profiles with ZAM 180 g/m² coating
- Structural engineering and BIM modeling
- CNC fabrication at the group plant
5,000 m² project
Steel framing structure — MEP not included.
- LGS profiles with ZAM 180 g/m² coating
- Structural engineering and BIM modeling
- CNC fabrication at the group plant
These ranges cover the reference structure: LGS profiles, engineering, and fabrication. Every turnkey project — which can add civil works, MEP installations, cladding, finishes, and fit-out — is quoted by scope. Request a technical proposal with your project's area, use, and location, and get an answer within 48 hours.
Steel framing projects.
Verifiable area, timeline, and location — three projects from the 350+ portfolio.
The most asked questions about steel framing.
How much does steel framing cost per square meter in 2026?
What advantages does steel framing have over traditional construction?
How does steel framing perform in tropical climates? Does it corrode?
Which building codes does SmartBrix steel framing comply with?
How long does a steel framing project take?
Your steel framing project, quoted by engineers.
Send your project's area, use, and location — get a technical proposal within 48 hours.
Request technical proposal →