Grupo PEB Corp · SmartBrix Construction · Turnkey
PEB Corp Americas ↗ NewCon Steel® ↗ info@smartbrix.com
Steel Framing Modular Construction Projects About Contact · Quote
ES EN
Sector · Industry & logistics

Wide-span industrial warehouses, ready in months

Prefab industrial warehouses in steel framing (LGS/CFS) for manufacturing, logistics, and storage: long clear spans with no intermediate columns that leave the entire floor free to operate. Structure CNC-fabricated at the group plant, typical delivery in 3–5 months from foundations, and NSR-10, REP-21, and IBC compliance.

Summary · Industrial sector
  • Long clear spans with no intermediate columns: the floor stays free for racks, production lines, and forklift maneuvering.
  • 2026 reference cost: 220–260 USD/m² (500 m²) · 180–220 USD/m² (2,000 m²) · 150–180 USD/m² (5,000 m²) — structure only, MEP not included.
  • Typical timeline: 3–5 months from foundations — the structure is plant-fabricated in parallel with civil works.
  • Wide-span evidence: Centro de Eventos Autopista Norte — 6,000 m² delivered in 3 months (Bogotá).
01 · The system

Industrial space, nothing wasted.

Square meters that operate from day one: no columns in the way, no years on site, no hidden cost overruns.

A warehouse is measured by the usable space it delivers. Every intermediate column steals rack positions, cuts through a production line, and complicates forklift maneuvering; every extra week of construction delays the start of operations. Prefab industrial warehouses in steel framing — cold-formed steel (LGS/CFS), SmartBrix's primary line — attack both fronts: steel trusses that achieve long clear spans with no intermediate columns, and an industrial workflow that delivers the building in months, not years.

The workflow is SmartBrix's steel framing process: the project is modeled in BIM with clash detection before fabrication, profiles are CNC-produced to ±0.5 mm tolerance at the group plant (EMMA · Zona Franca de Panamá) and arrive on site cut, punched, and labeled, ready for dry assembly — up to 90% faster than traditional construction and with up to 30% less construction waste. The ZAM 180 g/m² coating protects the structure in demanding industrial and coastal environments, with hurricane-rated design verified up to 250 km/h (Cat. 4). And from Panamá, the structure ships directly to Central America and the Caribbean.

Nor is a warehouse a static roof: the system expands modularly, in stages, as the operation grows. And when storage is temporary, changes location, or must grow module by module, prefabricated modular warehouses — interconnectable modules with dry assembly — deploy, demount, and relocate with no wet works. The evidence for both systems, with verifiable area, timeline, and location, lives in the delivered projects.

02 · Advantages

Six advantages for industrial warehouses.

What industrialized construction solves in a manufacturing, logistics, or storage project.

  • 01
    Wide clear spans, no intermediate columns

    Steel trusses free up the entire floor plate: racks, production lines, and forklift traffic with zero obstructions. Evidence: 6,000 m² of wide spans at the Centro de Eventos Autopista Norte.

  • 02
    3–5 months from foundations

    The structure is plant-fabricated in parallel with civil works and dry-assembled with no curing times — up to 90% faster than traditional construction.

  • 03
    Predictable cost per square meter

    Published 2026 reference ranges and CNC fabrication at ±0.5 mm tolerance: fewer surprises on site and up to 30% less waste.

  • 04
    ZAM 180 g/m² corrosion protection

    Steel profiles with ZAM 180 g/m² coating resist tropical corrosion — built for demanding industrial environments and coastal zones.

  • 05
    Expandable by module

    The warehouse grows in stages when the operation demands it; modular warehouses expand module by module and relocate to another site.

  • 06
    NSR-10 · REP-21 · IBC compliance

    Design and structural calculation to each jurisdiction's code, with AISI S100-compliant profiles and electrical installations under RETIE in Colombia — permit documentation included.

Prefab steel framing warehouse for logistics and industrial storage

Industrial warehouses · wide clear spans for industry, logistics, and storage

03 · Industrial evidence

Wide spans and scale, proven.

Two projects with verifiable area, timeline, and location — each card links to its entry in the portfolio.

The Centro de Eventos Autopista Norte demanded exactly what a warehouse demands: wide clear spans with no intermediate columns and fast assembly — 6,000 m² delivered in 3 months with the same truss engineering as an industrial warehouse. And the Ministerio de Defensa Nacional headquarters — 39,000 m² in 8 months — proves the system holds up at true industrial scale.

04 · 2026 reference investment

How much does a prefab industrial warehouse cost?

Grupo PEB Corp reference ranges by project size — structure only, MEP not included.

500 m² project

220–260USD/m²

Steel framing structure — MEP not included.

  • LGS profiles with ZAM 180 g/m² coating
  • Structural engineering and BIM modeling
  • CNC fabrication at the group plant

5,000 m² project

150–180USD/m²

Steel framing structure — MEP not included.

  • LGS profiles with ZAM 180 g/m² coating
  • Structural engineering and BIM modeling
  • CNC fabrication at the group plant

These ranges cover the reference structure: LGS profiles, engineering, and fabrication. A turnkey warehouse — which may add civil works, roofing and cladding, MEP installations, and finishes — is quoted by scope. Request a technical proposal with your project's area, height, and location, and get an answer within 48 hours.

05 · Quick facts

System, spans, timelines, and codes.

The data an operations or logistics manager needs to evaluate the industrialized option.

System
Steel framing — cold-formed steel (LGS/CFS), CNC-fabricated (±0.5 mm tolerance)
Spans
Long clear spans with no intermediate columns — the exact span is defined in each project's engineering
Timeline
3–5 months from foundations · modular warehouses: complete project in 60–120 days
Codes
NSR-10 (Colombia) · REP-21 (Panamá) · IBC · AISI S100
Coating
ZAM 180 g/m² coated steel — resistant to tropical corrosion
06 · Frequently asked questions

Frequently asked questions about industrial warehouses.

How much does a prefab industrial warehouse cost in 2026?
For warehouses, the 2026 Grupo PEB Corp reference for industrialized steel structure, scaled by size, is: approx. 220–260 USD/m² for 500 m² projects, 180–220 USD/m² for 2,000 m², and 150–180 USD/m² for 5,000 m² (structure only, MEP not included). The final cost of a warehouse depends on roofing, cladding, finishes, and installations, so every project is quoted by scope: request a technical proposal and get an answer within 48 hours.
What is the maximum clear span of a steel framing warehouse?
The cold-formed steel truss system achieves long clear spans with no intermediate columns: the floor stays free for racks, production lines, and equipment maneuvering. The exact span of each warehouse is defined in the project's structural engineering, based on loads, height, and use. Wide-span evidence: the Centro de Eventos Autopista Norte — 6,000 m² solved with the same truss engineering as an industrial warehouse, delivered in 3 months.
How long does it take to build a prefab warehouse?
Steel framing projects are typically delivered in 3–5 months from foundations: while civil works advance on site, the structure is fabricated in parallel at the group's CNC plant (EMMA · Zona Franca de Panamá). Evidence: the Centro de Eventos Autopista Norte (6,000 m²) was delivered in 3 months and the Ministerio de Defensa Nacional (39,000 m²) in 8 months. For temporary or phased storage, a modular warehouse project is delivered in 60–120 days.
Can an existing warehouse be expanded?
Yes. Steel framing warehouses are designed as structural modules that allow phased growth — adding bays or new areas when the operation demands it — and prefabricated modular warehouses expand module by module, demount, and relocate to another site. Every expansion is BIM-modeled over the existing building and engineered to NSR-10, REP-21, or IBC depending on the jurisdiction.

Your industrial warehouse, operating in months.

Tell us the project's area, height, and location — get a technical proposal within 48 hours.

Request a technical proposal →