Construction case · Higher education · Bogotá, Colombia
Universidad del Rosario — Sede Mutis and Sede Norte
The Universidad del Rosario — Sede Mutis and Sede Norte reference records 11,500 m² and a 100-day delivery schedule in Bogotá. SmartBrix Construction executed the steel framing works with PEB Corp engineering, as part of the PEB Corp Group portfolio.

Project facts
11,500 m²
in 100 days
- Published area
- 11,500 m²
- Reference schedule
- 100 days
- Location
- Bogotá, Colombia
- System
- Steel framing
- Construction
- SmartBrix Construction
- Engineering
- PEB Corp
The area and schedule describe this reference; they are not a guarantee for another building.
Scope and responsibilities
SmartBrix construction. PEB Corp engineering.
PEB Corp provided structural engineering and the BIM model; SmartBrix Construction carried out on-site erection. The engineering case describes a cold-formed steel structure, prefabricated off site and designed to NSR-10. The figures describe the published reference, without allocating area or duration between the two campuses.
Read PEB Corp’s engineering case →
How to use this reference
For a university, the date when spaces can be brought into use is part of the project brief. This reference provides a specific area and schedule to review alongside the structural solution. A new building's program should account for its academic calendar, site condition, design status and included works.
Source of the facts and photograph: PEB Corp Group portfolio executed by SmartBrix Construction.
Your next project
Compare scope as well as area.
To evaluate a comparable project in Colombia, share:
- City, planned area and classroom, laboratory and shared-space requirements.
- Academic calendar and target date for bringing the building into use.
- Access conditions and relationship to existing buildings.
- Drawings, geotechnical study, building-services scope and finishes.
Explore construction scope and applications →
Reply within 24 business hours · technical proposal / quote in 48 h.
About this case
Frequently asked questions
Who built the project and who provided the engineering?
Does this case's schedule apply to a new project?
More Colombian references
Explore more group projects.

Institutional · Bogotá, Colombia
Ministry of Defense
39,000 m² in 8 months · Bogotá, Colombia · Steel framing.
Read the case
Higher education · Barranquilla, Colombia
Corporación Universitaria de la Costa
2,900 m² in 3 months · Barranquilla, Colombia · Steel framing.
Read the caseAuthor: SmartBrix Construction Technical Team · Updated:
